Skip to contentBrickHOSPITAL HANDOVER
All tasksPlanning with your inputs

Facilities & emergency planning

Find the gaps before a disruption

Test critical-power coverage against an outage and flood scenario, then leave with an inspection brief.

  1. 1Your situation
  2. 2Compare a solution
  3. 3Take the next step

STEP 1 OF 3

Start with the building.

A preparedness action brief

Use the building’s annual electricity baseline. You can revise the inputs before sharing anything.

Outage and flood scenario

This is a stress test, not an event forecast. Water level and plant elevation must use the same local reference.

Proposed backup and shared assumptions

Critical demand is assumed to be 60% of peak; outdoor temperature 40°C. Protected plant is raised to at least 1.5m. The full study exposes all equipment and scenario assumptions.

No profile or building connection needed.